Swarfix® used by Vår Energi

We are happy to announce that we have completed two successfully operations in cooperation with Vår Energi.

Achievements from 2 operations
  • 0 NPT 
  • 0 Incidents
  • Positive impact on carbon footprint
  • Swarf did not pass the Swarfix® downhole during the whipstock milling operations
  • BOP cleaning not required and excluded
  • Personnel on rig floor not exposed to swarf
  • Both operations were delivered without Swarfix personnel offshore

Confirmed by
  • 1 x string magnet just above the Swarfix®
  • 1 x string magnet shallow
  • No swarf on the shaker/flowline magnets